CCTV-monitored manual barrier level crossing on the Wessex route (ELR GTW2).
| 01:04 | 3S83 | 🚧 | EFNGSHD → EFNGSHD | ← from Guildford U.C.H.S. | active |
On today’s timetable, Ash crossing is predicted to be closed for about 8 h 36 min between 06:00 and 22:00, across roughly 102 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 6.9 min (00:07–00:14, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 10:28–11:28 in the morning and around 20:44–21:44 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Ash is a cctv-monitored manual barrier crossing (CCTV) on the Guildford U.C.H.S.–North Camp line (Wessex route · ELR GTW2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 953 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.8% of the warnings we could verify came true.
Typical timing error was ±39s (9 in 10 within 119s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.