Manually-controlled barrier level crossing on the Wessex route (ELR WPH1).
| No trains in the next 30 minutes. |
On today’s timetable, Farncombe West crossing is predicted to be closed for about 6 h 35 min between 06:00 and 22:00, across roughly 76 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 7.5 min (00:26–00:34, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:14–08:14 in the morning and around 17:20–18:20 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Farncombe West is a manually-controlled barrier crossing (MCB/MB) on the Guildford–Haslemere line (Wessex route · ELR WPH1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 389 trains through this crossing.
99.7% of observed passes were being warned about on this page when they passed, and 98.8% of the warnings we could verify came true.
Typical timing error was ±42s (9 in 10 within 104s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.