Wadborough level crossing

Automatic half-barrier level crossing on the Central route (ELR BAG2).

predicted
OPEN
for at least 2h

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 10:10–12:10+ 2h+
Under the hood
Sat 17 Oct · 10:10
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 10:10:52 · 60 avg · 0 in window
live observation: 0 up · 1 down
timetable cif full+upd 2026-10-16..2026-10-18
fetched 02:08:22
trust 41,628 active · 36,951 delays · 2,820 cancelled · 0 reconnects
Nearby crossings

All 148 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Wadborough crossing is predicted to be closed for about 2 min between 06:00 and 22:00, across roughly 1 closures. The longest single predicted closure is 1 minute. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:55–00:57, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 18:19–19:19 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road near Wadborough, Worcestershire.

Wadborough is a automatic half-barrier crossing (AHB) on the Worcestershire Parkway HL–Cheltenham Spa line (Central route · ELR BAG2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 362 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.

Typical timing error was ±15s (9 in 10 within 40s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.