CCTV-monitored manual barrier level crossing on the North and East route (ELR HBS).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 10:49 | π 2R06 | Bridlington β York Up (NW β SE) | +3 min |
| 10:58 | π 2R09 | York β Bridlington Down (SE β NW) | on time |
On todayβs timetable, Walton Street crossing is predicted to be closed for about 4 h 18 min between 06:00 and 22:00, across roughly 56 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 07:03β08:03 in the morning and around 16:42β17:42 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Spring Bank West in Hull, East Riding of Yorkshire.
Walton Street is a CCTV-monitored manual barrier crossing (CCTV) on the GooleβFerriby line (North and East route · ELR HBS). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β