Signal-box-controlled level crossing on the Wales route (ELR HNL1).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 06:09 | π 1W91 | Cardiff Central β Holyhead Up (SW β NE) | on time |
| 06:17 | π 6A26 | Moreton-on-Lugg β East Usk Yard (FHH) Down (NE β SW) | no show |
| 06:32 | π 1V88 | Shrewsbury β Fishguard Harbour Down (NE β SW) | on time |
| 06:47 | π 1W12 | Cardiff Central β Manchester Piccadilly Up (SW β NE) | +14 min |
| 06:49 | π§ 3S59 | Swindon Transfer β Hereford Up (SW β NE) | -14 min |
On todayβs timetable, Abergavenny crossing is predicted to be closed for about 3 h 35 min between 06:00 and 22:00, across roughly 46 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 10:00β11:00 in the morning and around 19:47β20:47 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is in Abergavenny, Monmouthshire, next to the station.
Abergavenny is a signal-box-controlled crossing (SBC) on the HerefordβPontypool line (Wales route · ELR HNL1). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β