Bainton level crossing

Automatic half-barrier level crossing on the East Coast route (ELR PMJ).

predicted
OPEN
for 40s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 1 min Β· on time

Next 30 min

OPEN 09:58–09:59 40s
CLOSED 09:59–10:01 2m
OPEN 10:01–10:16 15m
CLOSED 10:16–10:18 2m
OPEN 10:18–10:31 β†’ 13m
Under the hood
Thu 22 Oct Β· 09:58
Today Tomorrow

Trains in window

10:00 πŸš„ 1N47 Stansted Airport β†’ Birmingham New Street Down (E β†’ W) approaching
10:01 πŸš„ 1L98 Bristol Temple Meads β†’ Stansted Airport Up (W β†’ E) approaching
10:11 πŸš› 6L54 Tunstead Sdgs (FHH) β†’ Parkeston S.S. Up (W β†’ E) no show
10:18 πŸš› 6L47 Mountsorrel Sdgs β†’ Trowse Yard Up (W β†’ E) +38 min
10:25 πŸš› 6E69 Tunstead Sdgs (FHH) β†’ Peterborough West Yard Up (W β†’ E) no show
10:30 πŸš› 4M54 Parkeston S.S. β†’ Tunstead Sdgs (FHH) Down (E β†’ W) no show
πŸš„Express passenger πŸš›Freight
now 09:58:53 Β· 145 avg Β· 6 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active Β· 31,697 delays Β· 1,962 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Bainton crossing is predicted to be closed for about 1 h 28 min between 06:00 and 22:00, across roughly 37 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.8 min (09:05–09:08, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:00–08:00 in the morning and around 18:16–19:16 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Tallington Road in Bainton, Cambridgeshire.

Bainton is a automatic half-barrier crossing (AHB) on the Peterborough North Yd GBRf–Ketton Ward SDG GBRF line (East Coast route · ELR PMJ). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 452 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.7% of the warnings we could verify came true.

Full accuracy report β†’

Is this right?