Uffington And Barnack level crossing

Manual gate level crossing on the East Midlands route (ELR PMJ).

predicted
OPEN
for 25s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 3 min Β· on time

Next 30 min

OPEN 10:00–10:01 25s
CLOSED 10:01–10:04 3m
OPEN 10:04–10:12 8m
CLOSED 10:12–10:16 5m
OPEN 10:16–10:26 9m
CLOSED 10:26–10:30 β†’ 5m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

09:59 πŸš„ 1L98 Bristol Temple Meads β†’ Stansted Airport Up (W β†’ E) on time
10:04 πŸš„ 1N47 Stansted Airport β†’ Birmingham New Street Down (E β†’ W) on time
10:09 πŸš› 6L54 Tunstead Sdgs (FHH) β†’ Parkeston S.S. Up (W β†’ E) no show
10:16 πŸš› 6L47 Mountsorrel Sdgs β†’ Trowse Yard Up (W β†’ E) +38 min
10:22 πŸš› 6E69 Tunstead Sdgs (FHH) β†’ Peterborough West Yard Up (W β†’ E) no show
10:30 πŸš› 4L05 Ditton (O'Connor) GBRf β†’ Felixstowe South GBRF Up (W β†’ E) -2 min
10:31 πŸš› 4M54 Parkeston S.S. β†’ Tunstead Sdgs (FHH) Down (E β†’ W) no show
πŸš„Express passenger πŸš›Freight
now 10:00:38 Β· 145 avg Β· 7 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,964 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Uffington And Barnack crossing is predicted to be closed for about 3 h 23 min between 06:00 and 22:00, across roughly 43 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:41–07:41 in the morning and around 17:48–18:48 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Uffington Road near Pilsgate, Cambridgeshire.

Uffington And Barnack is a manual gate crossing (MGH) on the Peterborough North Yd GBRf–Ketton Ward SDG GBRF line (East Midlands route · ELR PMJ). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?