CCTV-monitored manual barrier level crossing on the East Coast route (ELR ECM1).
| 00:06 | 6Q69 | 🚧 | PBROEFL → SOKEJN | ← from Peterborough North Yd GBRf | cancelled |
| 00:25 | 1N35 | 🚄 | KNGX → YORK | ← from Peterborough North Yd GBRf | on time |
| 00:29 | 1E30 | 🚄 | EDINBUR → KNGX | → from Grantham | -1 min |
On today’s timetable, Tallington crossing is predicted to be closed for about 12 h 16 min between 06:00 and 22:00, across roughly 88 closures. The longest single predicted closure is 25 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:13–09:13 in the morning and around 12:37–13:37 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Tallington is a cctv-monitored manual barrier crossing (CCTV) on the Peterborough North Yd GBRf–Grantham line (East Coast route · ELR ECM1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 2 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 92.3% of the warnings we could verify came true.
Typical timing error was ±50s (9 in 10 within 59s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.