Church Lane level crossing

CCTV-monitored manual barrier level crossing on the North and East route (ELR DSN3).

predicted
CLOSED
for 2 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 2 min Β· 2 min early

Next 30 min

CLOSED 10:00–10:03 2m
OPEN 10:03–10:08 5m
CLOSED 10:08–10:11 3m
OPEN 10:11–10:34 β†’ 23m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

10:02 πŸš† 2D18 Bishop Auckland β†’ Saltburn Down (NW β†’ SE) -2 min
10:11 πŸš† 2D15 Saltburn β†’ Darlington Up (SE β†’ NW) active
10:21 πŸš› 6F32 Boulby Mine Carlin How FHH β†’ Middlesbrough (FHH) Up (SE β†’ NW) sched
10:24 πŸš› 6F23 Middlesbrough (FHH) β†’ Boulby Mine Carlin How FHH Down (NW β†’ SE) no show
10:28 πŸš› 6F23 South Bank Tees Dock (FHH) β†’ Boulby Mine Carlin How FHH Down (NW β†’ SE) sched
πŸš†Passenger πŸš›Freight
now 10:00:57 Β· 105 avg Β· 5 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,966 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Church Lane crossing is predicted to be closed for about 4 h 31 min between 06:00 and 22:00, across roughly 53 closures. The longest single predicted closure is 11 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 07:05–08:05 in the morning and around 19:18–20:18 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Redcar Lane in Redcar, North Yorkshire.

Church Lane is a CCTV-monitored manual barrier crossing (CCTV) on the Redcar Central–Saltburn line (North and East route · ELR DSN3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?