Dean level crossing

Manually-controlled barrier with obstacle detection level crossing on the Wessex route (ELR RTJ2).

predicted
CLOSED
for 56s

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 now · 1 min early

Next 30 min

CLOSED 08:01–08:01 56s
OPEN 08:01–08:05 4m
CLOSED 08:05–08:09 3m
OPEN 08:09–08:14 5m
CLOSED 08:14–08:19 5m
OPEN 08:19–08:33 → 14m
Under the hood
Tue 06 Oct · 08:01
Today Tomorrow

Trains in window

07:52 🚆 2O19 Gloucester → Southampton Central Up (W → E) +5 min
08:01 🚆 2R26 Salisbury → Romsey Up (W → E) approaching
08:08 🚆 2S11 Romsey → Salisbury Down (E → W) approaching
08:18 🚛 6O55 Westbury Tarmac → Southampton Up Yard Up (W → E) -4 min
🚆Passenger 🚛Freight
now 08:01:01 · 141 avg · 4 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,460 active · 31,742 delays · 1,718 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Dean crossing is predicted to be closed for about 4 h 49 min between 06:00 and 22:00, across roughly 63 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 5.8 min (06:56–07:02, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:55–10:55 in the morning and around 19:42–20:42 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Dean is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Romsey–Salisbury line (Wessex route · ELR RTJ2). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 597 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.6% of the warnings we could verify came true.

Typical timing error was ±7s (9 in 10 within 57s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →