Dunbridge level crossing

Automatic half-barrier level crossing on the Wessex route (ELR RTJ2).

predicted
CLOSED
for 1 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 1 min · 8 min late

Next 30 min

CLOSED 07:12–07:13 1m
OPEN 07:13–07:22 9m
CLOSED 07:22–07:23 2m
OPEN 07:23–07:40 17m
CLOSED 07:40–07:43 → 2m
Under the hood
Mon 07 Sep · 07:12
Today Tomorrow

Trains in window

07:04 🚆 2R22 SalisburyRomsey Up (W → E) -1 min
07:13 🚄 1F06 Portsmouth HarbourCardiff Central Down (E → W) approaching
07:23 🚄 1F03 Bristol Temple MeadsPortsmouth Harbour Up (W → E) approaching
07:39 🚛 4M50 Southampton M.C.T.Basford Hall Yard Down (E → W) sched
07:42 🚛 6O52 Westbury TarmacChichester Recp. Up (W → E) +27 min
🚄Express passenger 🚆Passenger 🚛Freight
now 07:12:00 · 111 avg · 5 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,149 active · 25,034 delays · 3,028 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Dunbridge crossing is predicted to be closed for about 2 h 55 min between 06:00 and 22:00, across roughly 70 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.9 min (05:52–05:54, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:48–08:48 in the morning and around 19:38–20:38 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Dunbridge is a automatic half-barrier crossing (AHB) on the Romsey–Salisbury Reception Line line (Wessex route · ELR RTJ2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 614 trains through this crossing.

99.8% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.

Typical timing error was ±3s (9 in 10 within 106s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?