Dean Hill level crossing

Manually-controlled barrier with obstacle detection level crossing on the Wessex route (ELR RTJ2).

predicted
CLOSED
for 1 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 1 min Β· 1 min late

Next 30 min

CLOSED 09:59–10:01 1m
OPEN 10:01–10:06 6m
CLOSED 10:06–10:10 3m
OPEN 10:10–10:12 2m
CLOSED 10:12–10:17 5m
OPEN 10:17–10:31 β†’ 14m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

09:53 πŸš„ 1F07 Cardiff Central β†’ Portsmouth Harbour Up (W β†’ E) +5 min
10:00 πŸš† 2S19 Romsey β†’ Salisbury Down (E β†’ W) approaching
10:10 πŸš† 2R34 Salisbury β†’ Romsey Up (W β†’ E) approaching
10:17 πŸš› 6O68 Westbury Tarmac β†’ Crawley F.Y. Up (W β†’ E) -4 min
πŸš„Express passenger πŸš†Passenger πŸš›Freight
now 09:59:48 Β· 138 avg Β· 4 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,963 cancelled Β· 9 reconnects
Nearby crossings

All 234 crossings in Southern β†’

About this crossing

How often it closes

On today’s timetable, Dean Hill crossing is predicted to be closed for about 5 h 9 min between 06:00 and 22:00, across roughly 67 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 5.4 min (07:00–07:05, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:56–10:56 in the morning and around 12:53–13:53 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on East Dean Road near East Dean, Hampshire.

Dean Hill is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Romsey–Salisbury line (Wessex route · ELR RTJ2). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 489 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.1% of the warnings we could verify came true.

Typical timing error was Β±5s (9 in 10 within 59s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?