Kimbridge level crossing

Automatic half-barrier level crossing on the Wessex route (ELR RTJ2).

predicted
CLOSED
for 15s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚧 now · 11 min late

Next 30 min

CLOSED 03:02–03:02 15s
OPEN 03:02–03:08 6m
CLOSED 03:08–03:11 2m
OPEN 03:11–03:47 β†’ 36m
Under the hood
Thu 15 Oct Β· 03:02
Today Tomorrow

Trains in window

03:02 🚧 6O27 Mountsorrell GBRF β†’ Eastleigh East Yard Up (NW β†’ SE) approaching
03:10 πŸš› 4V51 Southampton M.C.T. β†’ Cardiff Wentloog IFT Down (SE β†’ NW) active
03:25 ❓ 0M44 Eastleigh East Yard β†’ Kineton MOD GBRf Down (SE β†’ NW) sched
03:33 πŸš› 4M95 Southampton M.C.T. β†’ Trafford Park F.L.T. Down (SE β†’ NW) sched
πŸš›Freight 🚧Engineering ❓Other
now 03:02:29 Β· 143 avg Β· 4 in window
live observation: 1 up Β· 0 down
timetable cif full+upd 2026-10-14..2026-10-16
fetched 02:08:21
trust 32,476 active Β· 31,172 delays Β· 1,751 cancelled Β· 9 reconnects
Nearby crossings

All 234 crossings in Southern β†’

About this crossing

How often it closes

On today’s timetable, Kimbridge crossing is predicted to be closed for about 2 h 27 min between 06:00 and 22:00, across roughly 67 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (02:05–02:06, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:50–08:50 in the morning and around 19:37–20:37 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Kimbridge Lane in Kimbridge, Hampshire.

Kimbridge is a automatic half-barrier crossing (AHB) on the Romsey–Salisbury line (Wessex route · ELR RTJ2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 242 trains through this crossing.

99.6% of observed passes were being warned about on this page when they passed, and 99.8% of the warnings we could verify came true.

Typical timing error was Β±79s (9 in 10 within 96s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?