Manually-controlled barrier level crossing on the Wales route (ELR CNH3).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:55 | π 1W91 | Cardiff Central β Holyhead Down (NE β SW) | +9 min |
| 10:08 | π 6D43 | Crewe Coal Sidings (DRS) β Valley Nuclear Electric Down (NE β SW) | no show |
| 10:19 | π 1H86 | Holyhead β Manchester Airport Up (SW β NE) | active |
| 10:26 | π 1T32 | Warrington Bank Quay β Holyhead Down (NE β SW) | no show |
| 10:27 | π 1D32 | Manchester Airport β Holyhead Down (NE β SW) | cancelled |
On todayβs timetable, Gaerwen crossing is predicted to be closed for about 3 h 27 min between 06:00 and 22:00, across roughly 49 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 07:25β08:25 in the morning and around 12:06β13:06 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is near Llanddaniel Fab, Anglesey.
Gaerwen is a manually-controlled barrier crossing (MCB/MB) on the Bangor (Gwynedd)βBodorgan line (Wales route · ELR CNH3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β