Gaerwen level crossing

Manually-controlled barrier level crossing on the Wales route (ELR CNH3).

predicted
OPEN
for 16 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 19 min Β· running

Next 30 min

OPEN 09:59–10:16 16m
CLOSED 10:16–10:19 3m
OPEN 10:19–10:48 β†’ 29m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

09:55 πŸš„ 1W91 Cardiff Central β†’ Holyhead Down (NE β†’ SW) +9 min
10:08 πŸš› 6D43 Crewe Coal Sidings (DRS) β†’ Valley Nuclear Electric Down (NE β†’ SW) no show
10:19 πŸš„ 1H86 Holyhead β†’ Manchester Airport Up (SW β†’ NE) active
10:26 πŸš„ 1T32 Warrington Bank Quay β†’ Holyhead Down (NE β†’ SW) no show
10:27 πŸš„ 1D32 Manchester Airport β†’ Holyhead Down (NE β†’ SW) cancelled
πŸš„Express passenger πŸš›Freight
now 09:59:52 Β· 71 avg Β· 5 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,963 cancelled Β· 9 reconnects
Nearby crossings

All 235 crossings in Wales & Western β†’

About this crossing

How often it closes

On today’s timetable, Gaerwen crossing is predicted to be closed for about 3 h 27 min between 06:00 and 22:00, across roughly 49 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 07:25–08:25 in the morning and around 12:06–13:06 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is near Llanddaniel Fab, Anglesey.

Gaerwen is a manually-controlled barrier crossing (MCB/MB) on the Bangor (Gwynedd)–Bodorgan line (Wales route · ELR CNH3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?