Manual gate level crossing on the Wales route (ELR LJT1).
| No trains in the next 30 minutes. |
On today’s timetable, Tal-y-Cafn crossing is predicted to be closed for about 44 min between 06:00 and 22:00, across roughly 11 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:35–07:35 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Tal-y-Cafn is a manual gate crossing (MGH) on the Llandudno Junction–Blaenau Ffestiniog line (Wales route · ELR LJT1). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →