Litlington level crossing

Automatic half-barrier level crossing on the East Coast route (ELR SBR).

predicted
OPEN
for 7 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚛 in 9 min · 7 min early

Next 30 min

OPEN 04:55–05:01 7m
CLOSED 05:01–05:03 2m
OPEN 05:03–05:09 6m
CLOSED 05:09–05:10 2m
OPEN 05:10–05:17 6m
CLOSED 05:17–05:18 2m
OPEN 05:18–05:39 → 21m
Under the hood
Mon 07 Sep · 04:55
Today Tomorrow

Trains in window

04:51 🚃 5R03 Letchworth C.S.DRoyston Down (SW → NE) -7 min
05:03 🚛 6L02 Hanwell Bridge LoopChesterton Junction FHH Down (SW → NE) approaching
05:10 🚄 9S01 CambridgeBrighton Up (NE → SW) on time
05:18 🚆 2R03 RoystonLondon Kings Cross Up (NE → SW) active
🚄Express passenger 🚆Passenger 🚃Empty stock 🚛Freight
now 04:55:09 · 205 avg · 4 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,718 active · 21,554 delays · 2,954 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Litlington crossing is predicted to be closed for about 6 h 52 min between 06:00 and 22:00, across roughly 134 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:05–00:07, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:13–07:13 in the morning and around 18:31–19:31 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Litlington is a automatic half-barrier crossing (AHB) on the Letchworth A/D Line–Royston Loop line (East Coast route · ELR SBR). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 1,013 trains through this crossing.

99.9% of observed passes were being warned about on this page when they passed, and 97.7% of the warnings we could verify came true.

Typical timing error was ±73s (9 in 10 within 140s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?