Automatic barrier locally monitored level crossing on the Western route (ELR NDN).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:52 | π 2R53 | Okehampton β Exeter Central Up (W β E) | +2 min |
| 09:55 | π 2K04 | Exeter Central β Okehampton Down (E β W) | +3 min |
| 10:27 | π 2R83 | Barnstaple β Exeter Central Up (W β E) | on time |
On todayβs timetable, Salmon Pool crossing is predicted to be closed for about 2 h 17 min between 06:00 and 22:00, across roughly 50 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 10:26β11:26 in the morning and around 19:37β20:37 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is in Salmonhutch, Devon.
Salmon Pool is a automatic barrier locally monitored crossing (ABCL) on the TauntonβYeoford line (Western route · ELR NDN). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β