Three Horseshoes No1 level crossing

Automatic half-barrier level crossing on the Anglia route (ELR EMP).

right now
OPEN
for 11 min
next: 🚛 in 13 min · 14 min early

Next 30 min

OPEN 02:05–02:17 11m
CLOSED 02:17–02:19 2m
OPEN 02:19–02:38 → 19m
Under the hood
Fri 24 Jul · 02:05
Today Tomorrow

Trains in window

02:18 4M13 🚛 FLXSSGB → HMSHBRF ← from March Up Yard GBRF -14 min
02:19 4L23 🚛 HMSHBRF → FLXSNGB → from Peterborough -20 min
🚛Freight
now 02:05:46 · 575 avg · 2 in window
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,100 active · 30,165 delays · 1,826 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Three Horseshoes No1 crossing is predicted to be closed for about 8 h 59 min between 06:00 and 22:00, across roughly 141 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:11–07:11 in the morning and around 15:35–16:35 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Three Horseshoes No1 is a automatic half-barrier crossing (AHB) on the March Up Yard GBRF–Peterborough line (Anglia route · ELR EMP). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?