Whitemoor Drove level crossing

Automatic half-barrier level crossing on the Anglia route (ELR EMP).

predicted
OPEN
for 26s

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚛 in 2 min · running

Next 30 min

OPEN 06:35–06:35 26s
CLOSED 06:35–06:37 2m
OPEN 06:37–06:42 4m
CLOSED 06:42–06:43 2m
OPEN 06:43–06:48 5m
CLOSED 06:48–06:50 2m
OPEN 06:50–07:01 11m
CLOSED 07:01–07:03 2m
OPEN 07:03–07:04 1m
CLOSED 07:04–07:08 → 4m
Under the hood
Tue 06 Oct · 06:35
Today Tomorrow

Trains in window

06:27 🚛 6L53 Tunstead Sdgs (FHH) → Parkeston S.S. Up (W → E) no show
06:28 🚛 4M14 Felixstowe South GBRF → East Mids Gateway Tml GBRf Down (E → W) no show
06:33 🚛 6L26 Mountsorrel Sdgs → Chesterton Junction FHH Up (W → E) no show
06:34 🚄 1N41 Stansted Airport → Birmingham New Street Down (E → W) -1 min
06:37 🚛 4H83 Peterborough North Yd GBRf → March Up Yard GBRF Up (W → E) active
06:43 🚄 1L01 Nottingham → Norwich Up (W → E) on time
06:50 🚛 4E14 Felixstowe South GBRF → Doncaster Iport GBRF Down (E → W) +22 min
07:02 🚛 6L88 Dowlow Quarry FLHH → Brandon Down Sidings Up (W → E) no show
07:03 🚛 4L43 Doncaster Iport GBRF → Felixstowe North GBRF Up (W → E) -21 min
07:06 🚛 4M07 Felixstowe North GBRF → Birch Coppice GBRf Down (E → W) +18 min
🚄Express passenger 🚛Freight
now 06:35:29 · 201 avg · 10 in window
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,324 active · 31,642 delays · 1,668 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Whitemoor Drove crossing is predicted to be closed for about 3 h 14 min between 06:00 and 22:00, across roughly 71 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 07:14–08:14 in the morning and around 19:07–20:07 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Whitemoor Drove is a automatic half-barrier crossing (AHB) on the March Up Yard GBRF–Peterborough line (Anglia route · ELR EMP). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?