Manually-controlled barrier level crossing on the Anglia route (ELR EMP).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:51 | π 4L66 | Goole Glassworks GBRF β March Up Yard GBRF Up (NW β SE) | no show |
| 09:54 | π 4M54 | Parkeston S.S. β Tunstead Sdgs (FHH) Down (SE β NW) | no show |
| 10:03 | π 1R66 | Norwich β Liverpool Lime Street HL/ML Down (SE β NW) | on time |
| 10:07 | π 1L05 | Sheffield β Norwich Up (NW β SE) | +4 min |
| 10:14 | π 2L73 | Peterborough β Ipswich Up (NW β SE) | +2 min |
| 10:28 | π 1L98 | Bristol Temple Meads β Stansted Airport Up (NW β SE) | on time |
| 10:32 | π 6E85 | Middleton Towers GBRF β Barnby Dun Rockware Glass GBRF Down (SE β NW) | no show |
On todayβs timetable, March South crossing is predicted to be closed for about 5 h 1 min between 06:00 and 22:00, across roughly 64 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 07:19β08:19 in the morning and around 18:00β19:00 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Creek Road in March, Cambridgeshire.
March South is a manually-controlled barrier crossing (MCB/MB) on the ElyβMarch Up Yard GBRF line (Anglia route · ELR EMP). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β