Norwood Road level crossing

Automatic half-barrier level crossing on the Anglia route (ELR EMP).

right now
OPEN
for 7 min
next: 🚛 in 8 min · 36 min early

Next 30 min

OPEN 03:16–03:22 7m
CLOSED 03:22–03:24 2m
OPEN 03:24–03:36 12m
CLOSED 03:36–03:38 2m
OPEN 03:38–04:15 → 38m
Under the hood
Sat 25 Jul · 03:16
Today Tomorrow

Trains in window

03:09 0E64 MARCHUG → PBROGBF ← from March Up Yard GBRF no show
03:11 4E11 🚛 FLXSNGB → MBROGBR ← from March Up Yard GBRF -26 min
03:24 4E55 🚛 FLXSNFL → STHBFLT ← from March Up Yard GBRF -36 min
03:37 4L21 🚛 TINSGBR → FLXSSGB → from Peterborough -9 min
03:46 4E54 🚛 FLXSNFL → DONCRPF ← from March Up Yard GBRF no show
🚛Freight Other
now 03:16:00 · 206 avg · 5 in window
timetable cif full+upd 2026-07-23..2026-07-25
fetched 23:23:05
trust 34,594 active · 30,572 delays · 2,350 cancelled · 0 reconnects
Nearby crossings

All 873 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Norwood Road crossing is predicted to be closed for about 3 h between 06:00 and 22:00, across roughly 74 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:56–11:56 in the morning and around 13:10–14:10 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Norwood Road is a automatic half-barrier crossing (AHB) on the March Up Yard GBRF–Peterborough line (Anglia route · ELR EMP). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?