| 10:31 | π 4L19 | Doncaster Iport GBRF β London Gateway GBRF Up | no show |
| 10:59 | π 4L19 | Tinsley Yard GBRf β London Gateway GBRF Up | no show |
| 10:59 | π 4L19 | Masborough N&W GBRF β London Gateway GBRF Up | no show |
| 11:00 | π 2K12 | Peterborough β Lincoln Down | active |
| 11:08 | π 6E86 | Middleton Towers GBRF β Monk Bretton Redfearns GBRF Down | -14 min |
| 11:14 | π 2K09 | Lincoln β Peterborough Up | on time |
On todayβs timetable, Tinsley's crossing is predicted to be closed for about 2 h 15 min between 06:00 and 22:00, across roughly 30 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:22β09:22 in the morning and around 19:27β20:27 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Campain's Lane near Deeping St Nicholas, Lincolnshire.
Tinsley's is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the DownβUp line (East Midlands route · ELR WEB). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β