Woodcroft level crossing

Manual gate level crossing on the East Coast route (ELR ECM1).

right now
OPEN
for 16 min
next: 🚄 in 19 min · on time

Next 30 min

OPEN 00:15–00:31 16m
CLOSED 00:31–00:34 3m
OPEN 00:34–02:15+ 1h+
Under the hood
Fri 24 Jul · 00:15
Today Tomorrow

Trains in window

00:34 1E30 🚄 EDINBUR → KNGX → from Grantham on time
🚄Express passenger
now 00:15:08 · 265 avg · 1 in window
lx berths down: YC/0487→YC/[email protected] · down: YC/0513→YC/[email protected] · up: YC/0524→YC/[email protected] · up: YC/0544→YC/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,035 active · 29,995 delays · 1,737 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Woodcroft crossing is predicted to be closed for about 11 h 50 min between 06:00 and 22:00, across roughly 93 closures. The longest single predicted closure is 15 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 4.4 min (23:58–00:02, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:47–09:47 in the morning and around 12:06–13:06 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Woodcroft is a manual gate crossing (MGH) on the Peterborough North Yd GBRf–Grantham line (East Coast route · ELR ECM1). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 16 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 95.2% of the warnings we could verify came true.

Typical timing error was ±57s (9 in 10 within 236s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →