Manually-controlled barrier with obstacle detection level crossing on the East Coast route (ELR WEB).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 10:41 | π 4L19 | Doncaster Iport GBRF β London Gateway GBRF Up | no show |
| 10:53 | π 2K12 | Peterborough β Lincoln Down | active |
| 10:59 | π 6E86 | Middleton Towers GBRF β Monk Bretton Redfearns GBRF Down | -15 min |
| 11:09 | π 4L19 | Tinsley Yard GBRf β London Gateway GBRF Up | no show |
| 11:09 | π 4L19 | Masborough N&W GBRF β London Gateway GBRF Up | no show |
On todayβs timetable, Folly Bank crossing is predicted to be closed for about 2 h 33 min between 06:00 and 22:00, across roughly 31 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:55β09:55 in the morning and around 18:53β19:53 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Thorney Road in Peakirk, Cambridgeshire.
Folly Bank is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the DownβUp line (East Coast route · ELR WEB). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β