Ketton level crossing

Manually-controlled barrier level crossing on the East Midlands route (ELR PMJ).

right now
OPEN
for 4 min
next: 🚛 in 7 min · scheduled

Next 30 min

OPEN 02:04–02:09 4m
CLOSED 02:09–02:12 3m
OPEN 02:12–02:16 4m
CLOSED 02:16–02:19 3m
OPEN 02:19–03:14 → 55m
Under the hood
Fri 24 Jul · 02:04
Today Tomorrow

Trains in window

02:12 6M10 🚛 PBROWY → TUNSFHH ← from Peterborough North Yd GBRf sched
02:19 4L22 🚛 TRFDEUG → FLXSSGB ← from Peterborough North Yd GBRf -19 min
🚛Freight
now 02:04:39 · 146 avg · 2 in window
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,100 active · 30,165 delays · 1,822 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Ketton crossing is predicted to be closed for about 2 h 39 min between 06:00 and 22:00, across roughly 39 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:18–07:18 in the morning and around 18:17–19:17 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Ketton is a manually-controlled barrier crossing (MCB/MB) on the Peterborough North Yd GBRf–Manton Jn line (East Midlands route · ELR PMJ). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?